24H全国咨询热线 400-668-3536

导航

/ ABOTU US / 关于韦弗斯

百年企业,百年品牌

韦弗斯新闻动态
最新动态
SF6安全保障专家

专注于SF6气体检测的专业化

135 85763546

What are the main process requirements and points when dealing with SF6 gas leakage?

发布时间:2016-07-13 来源:ydlcb 浏览次数:35次

(1) Strictly abide by the principle of plugging, and plug from the high-pressure side of the leakage point.

(2) The seal is not deformed, not rusty, and the sealing surface is smooth and clean.

(3) In the installation process, the important thing is "cleanliness". Can be cleaned with anhydrous ethanol. Do not allow visible dust and hair to adhere to the sealing surface.

(4) After installation, carefully do the leak detection work.

(5) In the process of plugging, we must not only strictly abide by the principle of plugging, the correct use of various adhesives and adhesive tools, but also have a strong sense of responsibility and a high level of technology.

SF6 is not only an important standard to ensure SF6 equipment and personal health, but also an important measure for human beings to care for the earth and protect the earth's environment, which has far-reaching significance.