Installation of SF6 leakage monitoring system in 2

Wefus Inspection Technology (Shanghai) Co., Ltd. signed a contract with Linfen Power Supply Company for the installation and construction of SF6 density micro-water monitoring system and SF6 concentration online monitoring system, and successfully installed the SF6 leakage monitoring system (Winfoss-S1), which met the needs of the other party and achieved the desired results.

   

Linfen Power Supply Company Tao Tang 220KV substation is located in Huozhou City, Shanxi Province, Linfen power supply Company Tao Tang 220KV substation covers an area of 16.68 mu, with two 180,000 kVA main transformers. The operation of the station not only meets the needs of industrial and agricultural production and People's Daily life in Huozhou City, Fenxi County and the surrounding areas, but also makes the grid structure more reasonable, and provides reliable power for the western electrified railway.


 1730194781.jpg 1730194793.jpg


The GIS room of the power station adopts Wevers SF6 leak monitoring system (Winfoss-S1), which is a comprehensive solution for on-site SF6 concentration, oxygen content and temperature and humidity monitoring. Provides both real-time alarm and data store query functions. The simple operation panel of the system and the LCD dynamic display make it easy for users to master all the operation and use of the system. The gas concentration state at the GIS equipment is monitored in a real-time and dynamic manner. The organic combination of the entire system leaves the user with minimal maintenance steps and costs. The system monitors the environment dynamics of GIS switch room 24 hours a day and creates a good safe environment for GIIS switch room.

   

Wevers Testing Technology (Shanghai) Co., Ltd. signed the installation and construction contract of SF6 density micro-water monitoring system and SF6 leakage monitoring and alarm system with Linfen Power Supply Company. After receiving the project task issued by the engineering project department, the company immediately responded by sending professional installation technical service personnel to the construction site to carry out construction. All equipment installation tasks were successfully completed, and the successful installation of the system effectively guaranteed the safety of the environmental personnel and equipment of the substation, so that the entire substation environment and indoor operation were raised to a new level.